When only the best will do.

Over 50 MVC Extensions

Grid View

Unlimited master-detail levels, Web Accessibility support, and unmatched end-user data analysis capabilities

Card View

Microsoft Outlook ® Contacts View style interface provided with rich data shaping and editing capabilities.

Vertical Grid

The ASP.NET MVC Vertical Grid is a feature-rich grid component presenting data records as grid columns.

Reporting

Native integration with DevExpress ASP.NET MVC Extensions and unparalleled design-time productivity

Charting

There are over 55 chart types for both 2D and 3D charting, featuring native integration with the DevExpress ASP.NET MVC OLAP Data Mining Pivot Grid Extension and the DevExpress ASP.NET MVC Reporting Platform.

Spreadsheet

Excel inspired UI, read/write XLSx, XLS, CSV and TXT files

Rich Text Editor

MS Word inspired UI, read/write DOCx, DOC, RTF and TXT files
Version: v2017 vol 1.3
Copyright © 2006-2017 Developer Express Inc
Your Next Great MVC App Starts Here

Get started today and download your 30-day trial of DevExpress MVC Extensions (includes 30 days of free technical support).

All demos ship with full source code and are included in the DevExpress MVC distribution. Refer to the Demos and Sample Applications topic to learn more.

DevExpress MVC Extensions ship as part of DevExpress Universal, DXperience and ASP.NET Subscriptions and are backed by a 60 day unconditional money-back guarantee.
To learn more and obtain pricing information, visit the Compare Features and Pricing webpage. For immediate assistance, contact us by Email at info@devexpress.com or by phone at +1 (818) 844-3383 between 7:30am and 4:30pm Pacific Time.